A full 53-hour closure of the I-405, roughly between the I-10 and U.S. 101, is planned for the weekend of July 16-17, 2011. The closure is needed because of demolition work scheduled on the Mulholland Bridge. Due to the steep nature of the bridge, the freeway in both directions must be closed to protect the public during demolition.
Demolition preparation work is scheduled to begin Friday night, July 15, 2011 at 10 p.m., and continue until Monday morning, July 18, 2011 at 5:00 a.m. During this period, the Mulholland Drive Bridge and both directions of the I-405 freeway and on- and off-ramps within the area of the closure will be closed to ensure public safety during bridge dismantling.
For more information, visit Metro or follow the I-405 Sepulveda Pass Widening Project on Facebook and Twitter.
The SanPedroNewsPilot.com is the social network and information outlet for San Pedro.
Want to keep up with the news in San Pedro, become a member.
Membership has its privileges!
• Got news you think everyone should know? Blog it.
• Have a show or attending a benefit? Put it on the calendar.
• Got video of the big game? Embed it.
• Photos of the new storefront or the school play? Upload them.
© 2024 Created by San Pedro News Pilot. Powered by
You need to be a member of San Pedro News Pilot to add comments!
Join San Pedro News Pilot